• Holland And Barrett Vitamins Gibraltar Offer

Mar 18 - Tests Continue At LNG Terminal

As part of the on-going commissioning programme of the LNG Terminal, all operational and safety systems are being thoroughly tested.

One of the systems in place to control pressure build-up in the terminal is the combustion of natural gas (flaring) which results in a small controlled flame.

This system was successfully tested for the first time on Sunday and these tests are likely to continue.

{fcomment}